Chapter 11 · Section 11.2 of 8
Agricultural land, irrigation and water: 99-year leases and concessions for farmland, foreigners' access, land use consolidation and subdivision, master plans and change of use, State land, Gabiro and requisitioned land, sub-leases from farmers and cooperatives, marshlands, the duty to exploit land, water use permits, irrigation schemes and water user associations, and environmental assessment
What you need to know
- Agricultural, livestock and forestry land is held on a 99-year emphyteutic lease under Article 18 of Prime Minister's Order N° 008/03 of 03/07/2022, while State land for commercial farming is usually granted as a concession of up to 49 years under Article 11 of Law N° 27/2021 of 10/06/2021 governing land; a foreigner holds either right only for investment (Article 16).
- Article 65 of the Land Law requires land planned for agriculture and livestock to be used in line with land use consolidation, and under Ministerial Order n° 002/MoE/24 of 10/07/2024 unexploited agricultural or forestry holdings of 5 hectares or more can be temporarily requisitioned after 90 days' notice, for three years (agriculture) or ten years (forestry), and assigned to another person able to exploit them.
- Swamp lands belong to the State and can be granted only through a concession agreement with the Ministry, never definitively (Article 33 of the Land Law); the published 2017 framework, Prime Minister's Order No 006/03 of 30/01/2017, classified swamps by management status and allowed unprotected swamps to be lent for up to 30 years, renewable.
- Under Ministerial Order No 001/MoE/24 of 02/04/2024 irrigation of more than one hectare needs a water resources use permit from the Rwanda Water Resources Board (RWB), applied for through the District Mayor with a fee of RWF 35,000, decided within 90 days and valid for up to 15 years; irrigation above ten hectares also requires an environmental impact assessment certificate and a feasibility study (Article 5).
- Using water without a required permit is an offence punishable by two to three months' imprisonment and a fine of RWF 500,000, or either, under Article 36 of Law N° 49/2018 of 13/08/2018, and PSTA5 targets an increase in irrigated land from 71,585 hectares in 2023 to 132,171 hectares by 2028/29.
Farmland within the land chapter
The general land regime, including the two forms of tenure, registration, transfer formalities, land tax and expropriation, is explained in the land chapter, starting with The Land Law and land tenure. This section deals with what is specific to farmland: how agricultural land is held and allocated, the use obligations that come with it, marshlands, water and irrigation, and the environmental approvals that large farms need. The principal instruments are Law N° 27/2021 of 10/06/2021 governing land (the Land Law); Prime Minister's Order N° 008/03 of 03/07/2022 on land allocation, emphyteutic leases and State land concessions and leases (the Land Allocation Order); Ministerial Order n° 002/MoE/24 of 10/07/2024 relating to temporary requisition of land and termination of land ownership contract (the Requisition Order); Law N° 49/2018 of 13/08/2018 determining the use and management of water resources in Rwanda (the Water Law); and Ministerial Order No 001/MoE/24 of 02/04/2024 relating to water resources use permit (the Water Permit Order).
Two facts frame every farmland project. Holdings are tiny: PSTA5 records an average of 0.45 hectares, with half of agricultural households holding under 0.2 hectares, so a commercial farm of any size is usually assembled from many parcels or obtained from the State. And land use is planned and policed: the Land Law protects land planned for agriculture, obliges holders to exploit it productively and allows the State to requisition idle holdings. The institutions are the Ministry of Environment, which is the Ministry in charge of land, the National Land Authority (NLA), which keeps the register and approves changes of use, the Rwanda Water Resources Board (RWB), which issues water permits, and the Districts, which monitor land use locally. Who regulates the rest of the sector is in Agricultural policy, law and regulators.
Tenure for farmland: 99-year leases, concessions and foreigners
Under Article 18 of the Land Allocation Order the exact term of an emphyteutic lease follows the designated use of the land, not the holder's nationality: 99 years for agricultural, livestock, forestry, wetland, water-body and buffer-zone land, against 49 years for residential, commercial and industrial land (FAQ 43). A packhouse, processing plant or staff housing on a farm may therefore sit on land with a different designated use and term from the fields around it, and the title of each parcel should be checked.
State land in the private domain is granted to investors either as a land concession under Article 11 of the Land Law, for strategic investment in activities such as agriculture, livestock and forestry, for up to 49 years renewable by agreement, or as a State land lease under Article 12 for commercial infrastructure. A concessionaire cannot sell, transfer or mortgage the land itself, only its rights over the property on it, and cannot transfer those rights or change the activity without prior approval. A concessionaire for agricultural use may later be granted an emphyteutic lease based on the infrastructure it has installed (Article 11 of the Land Law), which matters for financing because a lease, unlike a concession, can be mortgaged.
Under Article 16 of the Land Law a foreigner has rights only to an emphyteutic lease and a land concession, which "are only allocated for investment". A foreign holder must apply in writing to the registrar of land titles at least 90 days before its lease expires, failing which it loses the land, which becomes State private-domain land (Article 20 of the Land Allocation Order); a Rwandan's lease renews automatically (FAQ 41; FAQ 48). The Land Law defines a foreigner by reference to an individual's nationality or a company's or cooperative's foreign legal personality (Article 2(30)), makes no exception for East African Community or COMESA nationals, and does not say expressly how a Rwanda-incorporated company with foreign shareholders is treated. The analysis is in How foreign investors access land.
Master plans, designated use and change of use
Every parcel has a designated use under the land use and development master plan for its area (Article 54 of the Land Law). The national plan was established by Presidential Order N° 038/01 of 20/05/2022 establishing the National Land Use and Development Master Plan, and City of Kigali and District plans are established by Order of the Minister in charge of economic planning (Article 59). Any land use permit granted in contradiction with the plan is null and void (Article 61). A change of use, for example from agricultural to industrial for a processing plant, must be consistent with the master plan and approved by NLA (Article 63), and non-compliance with the plan carries an administrative fine of RWF 1,000,000 to RWF 3,000,000 and removal of the works (Article 76), multiplied by ten for a company or cooperative (Article 78) (FAQ 45).
Article 65 adds a rule specific to farmland: land planned for agricultural and livestock use "is protected and conserved", and every person must use it "in accordance with land use consolidation", with modalities to be set by Prime Minister's Order. No Prime Minister's Order under Article 65 had been located at 16 October 2026. PSTA5 plans an Agriculture Land Use Master Plan during 2024/25 to 2028/29, which may in time designate priority zones for particular value chains. The Gabiro Agribusiness Hub's 2026 call for proposals, for instance, excluded maize and maize seed for zoning and phytosanitary reasons, which shows that site-level crop restrictions can apply in addition to the master plan.
Land tax follows designated use. Under Article 12 of Law N° 048/2023 of 05/09/2023 determining the sources of revenue and property of decentralised entities, land used for agriculture, livestock or forestry of 2 hectares or less is exempt, and under Ministerial Order N° 002/23/10/TC of 24/11/2023 District Councils set the rate for agricultural and livestock land within a band of RWF 0 to 0.4 per square metre. The amounts are modest. In a farm sub-lease the sub-lessor pays the property tax and the sub-lessee pays the taxes inherent to its activities (Articles 11 and 12 of Ministerial Order N° 009/MoE/22 of 12/05/2022) (Land tax, property tax and transfer costs).
Land use consolidation and subdivision
Land use consolidation is defined in Article 2 of the Land Law as the procedure of rearranging small and fragmented land parcels to form larger holdings so that the land is managed and used efficiently and uniformly to increase its productivity. In Rwanda's consolidation programme it has meant that neighbouring smallholders in a designated area grow the same priority crop, in the same season, under a common plan, while each keeps his or her own title. For an investor, consolidation is both a constraint and an opportunity: the activities agreed in a sub-lease of agricultural, livestock or forest land must comply with land use consolidation, and the sub-lessee must use the land accordingly (Articles 6 and 11 of Ministerial Order N° 009/MoE/22 of 12/05/2022 determining modalities for sublease of agriculture, livestock and forest land), so a farm assembled from smallholder parcels inside a consolidation area must fit the area's crop plan or obtain the authorities' agreement to depart from it; but consolidated blocks also offer contiguous areas with organised farmers, which is the model PSTA5 pursues through its Food Basket Sites, planned to cover 324,702 hectares by 2028/29.
Subdivision rules have changed. According to a January 2026 report in The New Times citing the National Land Authority, unlike the 2013 law, which barred the subdivision of agricultural land below one hectare, the current law sets no minimum size for subdividing agricultural land; NLA's Director General said that a buyer of part of an agricultural parcel is registered as its owner, and she also warned against subdividing farmland in order to build on it. The Irembo help page for the subdivision service, which is free and has a processing time of 30 working days, still states that the minimum plot that can be subdivided is one hectare. Investors buying or sub-leasing part of a parcel should therefore confirm NLA's current practice for the specific parcel before signing, and should allow for delays: NLA reported a backlog of more than 55,000 survey files in January 2026.
Leasing from the State: concessions, hubs and requisitioned land
State land is allocated by competition, organised by the Ministry in charge of land with the investment promotion organ, unless the Cabinet approves otherwise (Article 13 of the Land Law). Without competition, the Rwanda Development Board (RDB) writes to the Minister in charge of land with the business plan, proof that the project is a strategic investment and the land size needed; the Ministry checks the master plan and reserves the land provisionally, an environmental impact assessment is evaluated before allocation, and the Minister and the investor sign the concession or lease (Articles 11 to 16 of the Land Allocation Order) (FAQ 46). The State may repossess land if the investor departs from the contract and business plan (Article 14 of the Land Law).
Two further routes are specific to under-used land. Under Article 72 of the Land Law the Minister may temporarily allocate poorly exploited land in the State's private domain to a person who shows the willingness and capability to make it productive, for up to five years renewable, by written agreement and according to an agreed investment plan; the Minister may take it back before expiry on paying compensation based on the investment made. And under Articles 11 to 14 of the Requisition Order, land requisitioned from an idle holder is managed by the Ministry, which may assign it to an interested person able to exploit it for no longer than the requisition period. The applicant applies in writing to the City of Kigali or the District with an exploitation plan and proof of technical and financial ability; the District's Executive Committee selects the applicant, the Minister signs an assignment contract, and the Chief Registrar records it with a caveat. The assignee pays the land tax and, if property on the land may be damaged, may pay its value, assessed by a certified valuer, to the owner.
Serviced irrigated land is also offered at hubs. Gabiro Agribusiness Hub Ltd's 2026 request for proposals, as republished by a recruitment portal, offered a block of 172.3 hectares in Nyagatare District, expandable to about 232 hectares after drainage works, at a lease fee of USD 375 per hectare per year with a 2% annual increase after the second year, payable annually in advance, a guarantee of one year's lease value before allocation, a term of up to 49 years renewable under a sub-lease agreement, and irrigation water at USD 0.19 per cubic metre billed monthly. Bidders needed a business plan on the hub's template, evidence of markets and at least 60% equity financing. Investors should obtain the current terms from the hub company itself. Hub plots work as sub-leases because Article 9 of Ministerial Order N° 009/MoE/22, which otherwise bars a sub-lessee from sub-letting, allows the State or a company in which the State is a shareholder to sub-lease land developed by the State or its partner for investment, for the remaining term.
Leasing from farmers and cooperatives
Most private farmland is assembled by sub-lease from smallholders. A holder of an emphyteutic lease or freehold may sub-lease by written contract (Article 26 of the Land Law), and a sub-lease of agricultural, livestock or forest land for five years or more must be registered in the land register (Article 28). Registration puts buyers and lenders on notice through the register; Article 18 of the sub-lease Order described below also binds a new holder of the parcel to the sub-lease's terms. Every person registered on the title, and the holder's spouse where the land is held jointly, must consent (Article 22). Since 16 October 2025 NLA has not accepted powers of attorney given by people in Rwanda for land transfer services, so each Rwanda-based signatory must attend in person; the procedure is in Land registration, titles and due diligence.
Only the holder of a lease or freehold may sub-lease (Article 26), so a cooperative cannot itself sub-lease its members' parcels unless it holds rights over them; it can, however, organise the members, negotiate a standard sub-lease and rent, and manage payments. Investors therefore usually sign one sub-lease per parcel, often in a standard form agreed with the cooperative and the Sector. Ministerial Order N° 009/MoE/22 of 12/05/2022, published in the Official Gazette n° 23 Bis of 06/06/2022, sets the minimum content: the identity, identification number, residence and marital status of both parties, the parcel's UPI, area and location, the agreed crops, forestry, nurseries or livestock, the start and end dates, the rent and its payment, rights and obligations, termination and dispute settlement (Articles 3 to 8). Rent is paid as agreed before the land is used (Article 8), and is not refundable because the sub-lessee does not use the land or loses a harvest to fortuitous events or poor yields (Article 16). The sub-lessee may use the land and its produce freely and may mortgage the activities it carries out on the land for the remaining term, but may not sub-let to a third party (Article 9). A new holder of the parcel is bound by the sub-lease (Article 18). On the wording of Article 20, the sub-lessor may terminate only on at least 90 days' notice once at least three-quarters of the term has run, and must allow time to harvest or pay fair compensation, while the sub-lessee may terminate on 15 days' notice by paying 5% of the rent for the remaining term. A sub-lessee cannot acquire the land by 30-year prescription (Article 50), so long occupation does not convert a sub-lease into ownership. Where the investor wants produce rather than land, an outgrower or contract farming arrangement, under which farmers keep their land and sell to the investor, avoids land-tenure risk; it is covered in Agro-processing, food safety, contract farming and exports.
Routes to farmland compared
| Route | Legal basis | Term | Main approvals | Can the land be mortgaged? |
|---|---|---|---|---|
| Buying an agricultural emphyteutic lease | Land Law Articles 16 and 21 to 24; Land Allocation Order Article 18 | Remaining term of a 99-year lease | Consent of registered holders and spouses; notarised contract; NLA registration | Yes |
| Sub-leases from smallholders | Land Law Articles 26 and 28; Ministerial Order N° 009/MoE/22 | As agreed; registration compulsory at five years or more | One contract per parcel; compliance with land use consolidation | Not the land; the sub-lessee may mortgage its activities on the land for the remaining term (Article 9 of the Order) |
| Concession of State land | Land Law Articles 11, 13 and 14; Land Allocation Order Articles 9 to 21 | Up to 49 years, renewable by agreement | Competition or RDB request and Cabinet approval; environmental assessment | No; only rights over property on the land |
| Temporary allocation of poorly exploited State land | Land Law Article 72 | Up to five years, renewable | Written agreement with the Minister; investment plan | Not stated in the Law |
| Assignment of requisitioned land | Requisition Order Articles 11 to 14 | No longer than the requisition (three years for agriculture, ten for forestry) | Application to the District; contract with the Minister; caveat on the register | Not stated in the Order |
| Marshland (swamp) concession | Land Law Article 33; Prime Minister's Order No 006/03 of 30/01/2017 | Up to 30 years renewable under the 2017 Order | Concession agreement; approved exploitation plan; registration | No; only the borrower's installations |
| Plot in an agribusiness hub | Hub sub-lease agreement | Up to 49 years renewable in the 2026 Gabiro call | Selection by the hub company; investor registration with RDB | Depends on the sub-lease terms |
Marshlands
Swamps, or marshlands, are among Rwanda's most productive farmland, especially for rice, vegetables and maize in the dry season, and PSTA5 counts 37,273 irrigated hectares of marshland in 2023, with a target of 42,473 by 2028/29. Their tenure is special. Under Article 33 of the Land Law swamp lands belong to the State, cannot be definitively allocated to anyone, and long occupation cannot justify a definitive takeover; they "may be granted through concession to a person based on a concession agreement concluded between the Ministry and the concessionaire". Protected swamps are in the State's public domain, which is inalienable (Article 31), while unprotected swamps are in its private domain (Article 32). A Prime Minister's Order is to list swamp lands, their classification and boundaries and set the modalities of their use, development and management.
The published framework is Prime Minister's Order No 006/03 of 30/01/2017 drawing up a list of swamp lands, their characteristics and boundaries and determining modalities of their use, development and management (Official Gazette no 07 of 13/02/2017), made under the 2013 land law and still published by RWB. Its Annex gives each swamp one of three statuses: full protection, use under specific conditions, or use without specific conditions. In unprotected swamps agriculture is an authorised activity, carried out according to the prescribed use and an exploitation plan approved by the Minister in charge of land; land may be lent for up to 30 years, renewable by agreement, under a contract registered with the registrar of land titles; fees are set by Ministerial instructions; the borrower may transfer or mortgage its installations but not the land; and a contract under which the project has not started within one year may be terminated after 60 days' notice.
Two cautions apply. Article 87 of the 2021 Land Law kept orders made under the 2013 law in force only where consistent with the new Law and for nine months after its publication, and no replacement Prime Minister's Order under Article 33 had been located at 16 October 2026, so the continuing legal force of the 2017 Order should be confirmed with the Ministry before relying on its terms. And marshlands are usually already farmed, often by cooperatives organised around an irrigation scheme, so an investor must deal with existing users, water user associations and the scheme's water permit, and the land is never available as security.
Use it or lose it: productive use and requisition
A land holder must exploit land productively and so as to increase its value (Article 46 of the Land Law), and Article 5 of Law N° 041/2026 of 02/09/2026 governing agriculture now adds that farmers must farm in a manner that ensures sustainable soil productivity. The enforcement tools are significant. Under Article 49 of the Land Law the State may terminate a land ownership contract after 90 days' written notice for breach of the holder's obligations, unless the holder shows reasonable grounds. Under Article 70 the Minister may requisition agricultural, livestock or forestry land left unexploited without sound reason (FAQ 47).
The Requisition Order sets the procedure. Only agricultural, livestock or forestry land of not less than five hectares that is unexploited may be requisitioned (Article 3). The District or City of Kigali must first, over six consecutive months, ask the owner in writing to exploit the land or explain why it is not exploited, and where the reason is reasonable, ask the owner to sub-lease it to someone who can (Article 4). The District may then ask the Minister to requisition land reported as unexploited for one year without reasonable ground, or where the owner ignored official letters (Article 5). The Minister gives 90 days' written notice; requisition is cancelled or suspended if, within that period, the owner justifies the non-use, shows a project to be implemented within one year, or sub-leases the land (Article 6). Requisition lasts three consecutive years for agricultural and livestock land and ten for forestry (Article 10), and the owner may apply to repossess the land within six months before the end of that period with a plan showing its ability to exploit it (Article 15). If the owner does not apply, the Minister may extend the assignment or terminate the land ownership contract, in which case the land is valued and paid to the owner after deduction of the cost of works (Articles 15 and 22).
For an investor this cuts both ways. A foreign investor that acquires a large holding but delays planting, for example while waiting for a water permit, should document its project and timetable with the District from the start. An investor looking for land may apply for the assignment of requisitioned land, but takes it only for the requisition period and must reckon with the owner's right of repossession.
Water use permits
Under Article 18 of the Water Law the State owns and controls water resources, and under Article 19 everyone is entitled to an equitable and reasonable share, but allocation gives priority to domestic needs, then environmental protection, then economic activities, so irrigation is third in line in a shortage. Article 21 subjects to a water use permit every use of water capable of modifying the flow or level of water, degrading its quality or threatening wetlands and the environment, and Article 22 provides for permit fees and annual water use fees, paid into the National Fund for Environment (FONERWA), to be set by Ministerial Order.
The Water Permit Order, published in the Official Gazette n° Special of 03/04/2024, replaced Ministerial Order nº 002/16.01 of 24/05/2013. Article 3 requires a permit, before the activity starts, for irrigation of a land surface of more than one hectare, construction of a dam or infrastructure in rivers or lakes, fish farming in lakes and ponds, water supply for livestock, coffee washing stations, industrial use and other listed activities. The application is addressed to RWB, as the authority in charge of water resources management, through the Mayor of the District where the activity will take place, with the prescribed form, identification or registration documents and proof of payment of a non-refundable application fee of RWF 35,000 into FONERWA (Article 4). For irrigation of more than ten hectares, a dam, infrastructure in rivers or lakes, a hydropower plant, gas extraction or ports, the application must also include an environmental impact assessment certificate and a feasibility study (Article 5(a)); fish ponds need a hydrological report and a recommendation from the organ in charge of fish farming, and coffee washing stations a hydrological report. Applications may be made online (Article 9).
RWB decides on the basis of the documents, water availability and quality, the volume requested, the effects on other users and the environment, the catchment management plan, District and land use plans and the statutory priorities (Article 6), and must notify the decision within 90 days (Article 7); an incomplete application lapses after six months (Article 8). A permit lasts up to 15 years, or the life of the activity if shorter, and may be extended on application with a further RWF 35,000 fee (Articles 11 and 14). The holder must respect the authorised daily, monthly, seasonal and annual volumes and the abstraction and discharge points, install and maintain measuring devices where irrigation exceeds ten hectares, and file an annual water use report (Article 12). A permit may be transferred only with RWB's approval, on payment of a RWF 35,000 fee, which buyers of irrigated farms must build into their closing conditions (Article 15). Using water without a required permit is an offence punishable by two to three months' imprisonment and a fine of RWF 500,000, or either (Article 36 of the Water Law). RWB reported in July 2026 that about 200 irrigation permits were among more than 1,300 permits issued.
Irrigation schemes, SSIT and water user associations
PSTA5 puts total irrigated area at 71,585 hectares in 2023, made up of 37,273 hectares of marshland irrigation, 9,439 hectares of hillside irrigation and 24,873 hectares under small-scale irrigation technology, and targets 132,171 hectares by 2028/29, with hillside irrigation rising to 48,667 hectares and small-scale irrigation to 41,031 hectares, and the rehabilitation of 15,000 hectares of existing schemes. Large public schemes are developed by the State, often with donor finance, and then operated by farmer organisations or, at hubs such as Gabiro, by a hub company that sells water to investors. The Small-scale Irrigation Technology (SSIT) programme, implemented by the Rwanda Agriculture and Animal Resources Development Board (RAB), co-finances pumps, pipes and drip and sprinkler kits for farmers, and a revamped irrigation equipment loan scheme under SSIT was announced in February 2026; the current co-financing shares should be confirmed with RAB.
Scheme governance is set by Ministerial Order N° 001/11.30 of 23/11/2011 establishing irrigation water users associations in irrigation schemes (Official Gazette nº 50 of 12/12/2011), which applies to all irrigation schemes on public or leased land. Each scheme has a single irrigation water users association made up of all its water users, with legal personality granted by the Ministry of Justice; the association is the only user body that signs the management transfer agreement with the Ministry and the District, runs operation and maintenance, holds the scheme's water permit and collects the water service fee, and it is distinct from the production and marketing cooperatives. No instrument repealing that Order was located; Article 9 of Law N° 041/2026 provides for a new Order of the Minister on the establishment, use and management of agricultural infrastructure, including irrigation, which had not been published at 16 October 2026. An investor farming inside a public scheme therefore becomes a water user bound by the association's rules and fees, and should check its permit, rules and arrears before signing.
Environmental and social impact assessment for large farms
Environmental and social impact assessment is governed by Ministerial Order No 003/MoE/25 of 19/08/2025 relating to environmental and social impact assessment. A developer of a listed project needs a certificate of approval from the organ authorised by the environment authority, which approves or asks for changes to the terms of reference within 14 days and decides on the report within 20 working days, a period it may extend; for registered investment projects the certificate is handled through RDB's One Stop Centre, and RDB's 2026 service charter gives 15 days for an environmental clearance and 45 days for a certificate (FAQ 89). For farms the decisive link is the Water Permit Order: irrigation of more than ten hectares cannot obtain a water permit without an environmental impact assessment certificate (Article 5(a)), so in practice every irrigated commercial farm of that size needs one. On State land, the assessment is evaluated before the concession or lease is granted (Article 12 of the Land Allocation Order).
Large farms commonly raise the same issues: clearing of natural vegetation, protection of protected swamps and of the protected banks of lakes and rivers, which are in the State's public domain, pesticide use and storage, drainage and return flows, and resettlement or compensation of existing users. The assessment should be scoped early, because the water permit cannot be issued without the certificate and planting depends on both.
Farmland due diligence in eight steps
- Search the registerFor each parcel, obtain the UPI and confirm on NLA's register the holders, tenure, registration date and term, designated use, area and any caveat, mortgage, requisition or termination note.
- Check the plan and useConfirm the designated use under the master plan, whether any part needs a change of use approved by NLA (Article 63), and whether the area is under land use consolidation or a Food Basket Site.
- Check marshland and buffer statusEstablish whether any part is swamp land, a protected wetland or a river or lake buffer in the public domain, and if so the classification and the concession route.
- Map the holders and consentsList every registered holder and spouse who must consent (Article 22), confirm they can attend the notary in person, and identify any cooperative or water user association involved.
- Check waterIdentify the water source, existing permits and their holders, the volumes authorised and whether a new permit or a transfer approved by RWB is needed (Water Permit Order, Articles 3 and 15).
- Scope the environmental assessmentIf irrigation will exceed ten hectares or the project is listed, commission the assessment and agree the terms of reference before committing to a planting date.
- Check use historyAsk the District for land use reports and letters, because a holding of 5 hectares or more idle for a year can be requisitioned under the Requisition Order.
- Register and diariseRegister sub-leases of five years or more (Article 28), record the lease expiry and, for a foreign holder, the date 90 days before it, and diarise the water permit expiry and annual water report.
Worked example
Taking a 172-hectare block at an irrigated agribusiness hub
A Rwandan company owned 80% by a Belgian fruit exporter bids for the 172.3-hectare block offered in the 2026 Gabiro call for proposals, on the published terms, to grow passion fruit and chillies under drip irrigation from 2027. Water use and capital cost are illustrative assumptions.
| Lease fee, years 1 and 2 | 172.3 ha x USD 375 = USD 64,612.50 a year, paid annually in advance. |
|---|---|
| Lease fee, years 3 and 4 | Rising 2% a year after year 2: USD 382.50 x 172.3 = USD 65,904.75 in year 3; USD 390.15 x 172.3 = USD 67,222.85 in year 4. |
| Guarantee before handover | One year's lease value: USD 64,612.50. |
| Water | Assumed use of 5,000 m³ per hectare a year: 861,500 m³ x USD 0.19 = USD 163,685 a year, billed monthly in US dollars, more than twice the lease fee. |
| Equity | Assumed project cost USD 6,000,000; the call requires at least 60% equity financing, so at least USD 3,600,000 of equity. |
| Expansion | If the block grows to about 232 ha after drainage works, the base lease fee becomes 232 x USD 375 = USD 87,000 a year. |
| Approvals to confirm | Whether the hub's water permit and environmental certificate cover the company's use or whether it needs its own (irrigation above 1 ha needs a permit; above 10 ha an environmental certificate), and RDB registration before contract award. |
| Tenure check | The right is a sub-lease of up to 49 years from the hub company; the company should confirm the hub's own title and term, and whether the sub-lease is registered and can support a lender's security. |
Water at about RWF 175 per kilogram of produce was reported by one Gabiro investor in July 2026; the tariff and currency are the main sensitivity in the model.
The company is foreign-owned but Rwanda-incorporated; the renewal rule for foreigners is tested in How foreign investors access land.
Questions investors ask about farmland, irrigation and water
Can a foreign investor lease farmland in Rwanda, and for how long?
Yes, for investment. Article 16 of Law N° 27/2021 gives a foreigner rights to an emphyteutic lease and a land concession. Agricultural land carries a 99-year lease under Article 18 of Prime Minister's Order N° 008/03 of 03/07/2022, State land concessions run up to 49 years, and a foreign holder must apply for renewal at least 90 days before expiry.
Can agricultural land in Rwanda be subdivided?
The 2013 land law barred subdividing agricultural land below one hectare. NLA was reported in January 2026 as saying that the current law sets no minimum, although the Irembo help page still states a one-hectare minimum and NLA warns against subdividing farmland to build. Confirm NLA's practice for the parcel before relying on a subdivision.
What happens if farmland in Rwanda is left idle?
Under Ministerial Order n° 002/MoE/24, agricultural or forestry land of 5 hectares or more left unexploited for a year without reasonable ground can be requisitioned after 90 days' notice, for three years for agriculture or ten for forestry, and assigned to someone able to exploit it. The State may also terminate the land contract on 90 days' notice.
Do I need a permit to irrigate a farm in Rwanda?
Yes, if more than one hectare is irrigated. Ministerial Order No 001/MoE/24 requires a water resources use permit from RWB, applied for through the District Mayor with a RWF 35,000 fee and decided within 90 days. Above ten hectares, an environmental impact assessment certificate and a feasibility study must accompany the application.
Can an investor farm a marshland in Rwanda?
Only under a concession agreement with the Ministry, because swamp lands belong to the State and cannot be allocated definitively (Article 33 of the Land Law). The 2017 swamp Order allowed lending of unprotected swamps for up to 30 years, but its continuing force should be confirmed, and protected swamps cannot be farmed.
Is an environmental impact assessment required for a large farm?
In practice, yes, where irrigation exceeds ten hectares, because the water permit application must include an environmental impact assessment certificate. Other listed projects need one under Ministerial Order No 003/MoE/25. The authorised organ approves terms of reference within 14 days and decides on the report within 20 working days.
Terms you will meet in the documents
| English | Kinyarwanda | French | Meaning |
|---|---|---|---|
| Emphyteutic lease | Ubukode burambye | Bail emphytéotique | The long-term lease from the State; 99 years for agricultural land. |
| Land use consolidation | Guhuza ubutaka | — | Rearranging small, fragmented parcels into larger holdings managed uniformly to raise productivity (Land Law, Article 2). |
| Swamp land (marshland) | Igishanga | Terre des marais | State land that can be granted only by concession, never definitively (Land Law, Article 33). |
| Temporary requisition | — | Réquisition temporaire | Taking over idle farm or forest land of 5 hectares or more for three or ten years under Ministerial Order n° 002/MoE/24. |
| Land concession | — | Concession foncière | A grant of State private-domain land for investment, up to 49 years; the land cannot be mortgaged. |
| Water resources use permit | — | Permis d'utilisation des ressources en eau | RWB's permit required for irrigation above one hectare, valid up to 15 years. |
| Irrigation water users association | — | Association des usagers de l'eau d'irrigation | The single body of water users in a scheme that holds its water permit and collects fees (Ministerial Order N° 001/11.30). |
| Sub-lease | — | Sous-emphytéose | A written lease from a leaseholder or freeholder; compulsory registration for farmland at five years or more (Article 28). |
| Designated use | Imikoreshereze y'ubutaka | Affectation des terres | The use assigned to a parcel by the master plan, which fixes its lease term and permitted activities. |
Related in this guide
Related investor FAQs
Official sources
- Official Gazette n° Special of 10/06/2021: Law N° 27/2021 of 10/06/2021 governing land (REMA copy), Articles 2, 11 to 16, 22, 26 to 33, 46, 49, 54 to 72 and 87
- National Land Authority: Prime Minister's Order N° 008/03 of 03/07/2022 on land allocation, emphyteutic lease and State land concession and lease
- National Land Authority: Ministerial Order n° 002/MoE/24 of 10/07/2024 relating to temporary requisition of land and termination of land ownership contract (Official Gazette n° Special of 11/07/2024)
- FAOLEX: Ministerial Order No 001/MoE/24 of 02/04/2024 relating to water resources use permit (Official Gazette n° Special of 03/04/2024)
- Policy Vault copy of the Official Gazette n° Special of 21/09/2018: Law N° 49/2018 of 13/08/2018 determining the use and management of water resources in Rwanda
- Rwanda Water Resources Board: Prime Minister's Order No 006/03 of 30/01/2017 on swamp lands, their characteristics, boundaries, use, development and management
- MINAGRI: PSTA5 abridged version (irrigation, Food Basket Sites and AgriHubs targets)
- National Land Authority: Ministerial Order N° 009/MoE/22 of 12/05/2022 determining modalities for sublease of agriculture, livestock and forest land (Official Gazette n° 23 Bis of 06/06/2022)
- The New Times (news): Land surveying faces backlog of over 50,000 pending applications (NLA statements on subdivision, January 2026)
- Africarrières (recruitment portal republishing the notice): Gabiro Agribusiness Hub Ltd request for proposals, 2026
Have a question about your own situation?
Ask Be Rwanda Wise's Rwandabot, the AI legal-information chatbot. It checks official Rwandan sources and points you to the governing law, or read how to find and check a Rwandan advocate.
Ask Rwandabot about thisOpen in the appFind a lawyerThis page gives legal and tax information, not legal advice. Rates, thresholds and procedures change; the content is reviewed against official sources, but you should confirm anything important with the relevant authority or an advocate registered with the Rwanda Bar Association before you act. Laws are published in Kinyarwanda, English and French in the Official Gazette; check the official text before relying on a translation.